A structured snag list prevents occupancy surprises. Walk every zone with this framework before signing handover.
Finishes and joinery
- Paint consistency, touch-ups, and edge alignment
- Door operation, hardware, and soft-close adjustment
- Flooring transitions, carpet tile replacement stock
MEP and services
- Lighting levels and switching logic
- HVAC balance per zone, temperature and noise
- Power outlets, UPS paths, and labelling
- Plumbing pressure and leak checks
Fire and life safety
- Detector coverage and alarm audibility
- Emergency lighting duration test
- Fire stopping at penetrations
Documentation
- As-built drawings and O&M manuals
- Test certificates for electrical and fire systems
- Warranty schedules for equipment
Spaceio+ closes snags against a digital punch list on Spaceio+ AI before client walkthrough. Contact us for turnkey delivery with structured handover.
Planning a commercial fit-out?
Talk to Spaceio+ about turnkey delivery, PMC, or trade execution for your office, hotel, or managed workspace.